Fully assembled delivery planning

Plan the path and final position before the fully assembled workstation arrives.

Every STK LABS workstation ships fully assembled. Confirm the delivery path, final position and site conditions before the workstation arrives.

Fully assembled

Use this as planning guidance, then validate the final procedure against the selected product, facility requirements and approved documents.

01

Confirm the delivery path

Measure the full route for the assembled workstation before delivery day.

  • Confirm dock, elevator, corridor and doorway dimensions
  • Account for turns, thresholds and overhead restrictions
  • Protect finished floors and identify the staging area
  • Match handling equipment and labor to the approved shipment
02

Place + level

Move the fully assembled workstation into its approved position and stabilize it for use.

  • Position the workstation without dragging finished surfaces
  • Level the station at the final location
  • Lock all casters on mobile configurations
  • Confirm the workstation does not obstruct doors, aisles or equipment access
03

Complete the site check

Review the finished station and surrounding services before use.

  • Inspect the workstation for shipping damage
  • Cycle height-adjustable benches through the clear range
  • Confirm cords and service loops do not bind
  • Verify the final position against the approved room and utility plan